Event: Bissell Point Plant Built Brief Description: The Bissell Point water filtration plant was built in 1867 following the cholera epidemic. Year: 1867 Decade: 1860 - 1869 Beginning Date: 1867 Ending Date: 1867 |
|
|||
people
structures events
sources home This
site was made possible by: the City of St. Louis Planning and Urban Design Agency and
|